English English Hindi Hindi Chinese (Simplified) Chinese (Simplified) Spanish Spanish French French Arabic Arabic Russian Russian

Green Energy Initiatives

Green Energy Initiatives

A Solar Power Plant has been installed at the site for captive requirements as part of our environmental protection goals. currently, 1.0 Mega Watt is under commissioning while plans are underway to increase the capacity to 5.0 Mega Watt.

We use our Agro Biomass fire briquettes as boiler fuel to minimize emissions and eventually replace the use of fossil fuels like coal and gas.

As part of our Green Belt Initiative, Agrisol has ensured a plantation of approximately 15000 trees around the manufacturing plant.

Also, we have developed a half-acre MIAWAKI  forest with future plans to extend it to a 10-acre green belt.

Skip to content